Thépenier called upon Pharmadec to work with them on modifying their existing site. After drawing up a Site Plan, our teams erected a new building to be used as offices, as well as for production and storage.

The challenge in the project


Thépenier is a pharmaceutical laboratory specialising in liquids, creams and topical powders for the cosmetics and pharmaceutical industries. Since 2012, the firm has been a subsidiary of the Japanese group, NIPPON SHIKIZAI, leader in the make-up sector. As part of its development strategy, Thépenier wanted to increase its production and storage capacity.

Our response


Pharmadec worked alongside Thépenier on the changes to the facilities reorganising the pharmaceutical production zone and adding a washroom. At the same time, the project aslo involved extending the storage area creating a new packing line (liquids and creams), creating offices and building two covered walkways between the various buildings. This project stands out because of the installation of heavy technical equipment such as the two-tonne mixers and a melter.

Technical features


  • Type of building

    Pharmaceutical industry site
  • City

    Saint Langis Les Mortagnes (61)
  • State of the project

    Built
  • Delivery date

    2014
  • Type of market

    Design - Construction
  • Construction time

    8
  • Built surface

    3300

Photo Thepenier Saint Langis 1


photo thepenier SaintLangisLesMortagnes 201609 (2)


photo thepenier SaintLangisLesMortagnes 201609 (12)


photo thepenier SaintLangisLesMortagnes 201609 (31)


photo thepenier SaintLangisLesMortagnes 201609 (35)


A project in mind ?

Do you wish to build, extend or renovate residential, commercial or business property? Tell us about your project to obtain a turnkey solution.

Contact us

Our other construction projects


Production units, warehouses, offices: take a look at all the turnkey projects we have designed for our clients.

News and advice

News and our skills


See our latest news and get advice from our experts to build your project in the best possible conditions.

Ils parlent de nous


Dès le départ, nous avons senti une réelle implication et envie des équipes de IDEC Santé pour participer à ce projet. Nous avons travaillé tous ensemble, main dans la main, en toute transparence, en tant que véritables partenaires.

Jean-Frédéric NAU

Responsable d'exploitation, achats, investissements et sécurité LEHNING

Find out more about this project

Le clé en main est pour moi le point fort de l’action menée avec IDEC Santé. Tout était pris en charge depuis la conception du bâtiment jusqu’à la livraison, y compris dans le suivi post livraison qui a été un élément fondamental. Si j’avais à recommencer, je signerai demain.

Elise CONTOUR

Directeur de THERAE

Find out more about this project

Plusieurs facteurs ont contribué à la réussite de ce projet. Le partenariat et l’habitude qu’ont les équipes d’INNOTHERA et de IDEC Santé à travailler ensemble. Nous avons aussi un point important pour en nous avec le travail en amont de conception, de design et d’études qui est mené avec IDEC Santé et qui est pour nous un point majeur de la réussite de ces projets.

Marc CUDELOU

Directeur du site INNOTHERA CHOUZY

Find out more about this project

Ce qui nous a séduit chez IDEC Santé, c'est avant tout le rapport qualité-prix de la prestation clé en main proposée. De plus, tout au long du projet nous avons été épaulés par une équipe de professionnels en mesure de nous orienter vers des choix techniques éclairés.

Cyrille GUEGAN

Plant manager chez MSD

Find out more about this project

Follow us on social networks to keep up to date with our latest news.