Synutra


Built

At the same time as the IDEC Group was setting up the biggest baby milk powder factory, Synutra called upon Pharmadec to build its new French headquarters and a quality control laboratory.

Eléments clés du projet


Surface en m2

39 500

Particularités

14 hectares de terrain

The challenge in the project


Synutra specialises in the production of baby milk (3rd leading manufacturer in China). At the same time as the IDEC Group was setting up the biggest baby milk powder factory, Synutra called upon Pharmadec to build its new French headquarters and a quality control laboratory.

Our response


The teams at Pharmadec worked with Synutra on the construction of its new HQ, including offices, rest rooms, meeting rooms and an exhibition hall. At the same time, Pharmadec designed and built a quality control laboratory including a physical analysis area, a microbial analysis area, an ISO 7 clean area, a washroom and staff/material access gateways. This project stands out because of the inclusion of its architecture and specific elements taken from Asian culture.


Technical features


  • Type of building

    Offices, Laboratory
  • City

    Carhaix-Plouguer (29)
  • State of the project

    Built
  • Delivery date

    2015
  • Type of market

    Design - Construction
  • Construction time

    8
  • Built surface

    1500

photo synutra carhaix plouguer 201606 (77)


photo synutra carhaix plouguer 201606 (100)


photo synutra carhaix plouguer 201606 (139)


photo synutra carhaix plouguer 201606 (141)


photo synutra carhaix plouguer 201606 (147)


Livre blanc

Retrouvez tous les dessous du projet en
téléchargeant son Livre Blanc.

Télécharger

A project in mind ?

Do you wish to build, extend or renovate residential, commercial or business property? Tell us about your project to obtain a turnkey solution.

Contact us

Our other construction projects


Production units, warehouses, offices: take a look at all the turnkey projects we have designed for our clients.

News and advice

News and our skills


See our latest news and get advice from our experts to build your project in the best possible conditions.

Ils parlent de nous


Dès le départ, nous avons senti une réelle implication et envie des équipes de IDEC Santé pour participer à ce projet. Nous avons travaillé tous ensemble, main dans la main, en toute transparence, en tant que véritables partenaires.

Jean-Frédéric NAU

Responsable d'exploitation, achats, investissements et sécurité LEHNING

Find out more about this project

Le clé en main est pour moi le point fort de l’action menée avec IDEC Santé. Tout était pris en charge depuis la conception du bâtiment jusqu’à la livraison, y compris dans le suivi post livraison qui a été un élément fondamental. Si j’avais à recommencer, je signerai demain.

Elise CONTOUR

Directeur de THERAE

Find out more about this project

Plusieurs facteurs ont contribué à la réussite de ce projet. Le partenariat et l’habitude qu’ont les équipes d’INNOTHERA et de IDEC Santé à travailler ensemble. Nous avons aussi un point important pour en nous avec le travail en amont de conception, de design et d’études qui est mené avec IDEC Santé et qui est pour nous un point majeur de la réussite de ces projets.

Marc CUDELOU

Directeur du site INNOTHERA CHOUZY

Find out more about this project

Ce qui nous a séduit chez IDEC Santé, c'est avant tout le rapport qualité-prix de la prestation clé en main proposée. De plus, tout au long du projet nous avons été épaulés par une équipe de professionnels en mesure de nous orienter vers des choix techniques éclairés.

Cyrille GUEGAN

Plant manager chez MSD

Find out more about this project

Follow us on social networks to keep up to date with our latest news.